Notable Project: CarTech’s Dual Station ESR Furnace bus tubes

Home / Powering Your Process / Notable Project: CarTech’s Dual Station ESR Furnace bus tubes

Carpenter Technologies - Latrobe, PA

IMG_0027

Problem: The retrofit and rebuild of Carpenter Technologies’ dual station ESR furnace bus tubes took some finesse. The ESR is an older furnace built circa 1960, and consequently sourcing spare components and the craftsmanship to perform the work is difficult.

Solution: The replacement bus tube components arrived at the customer’s facility on time, and were installed during the 2019 summer shutdown.  All components fit correctly. Bam!

Eager to solve problems, I2r POWER’s technical team is more than willing to help you unravel your challenges.

Have questions about this topic?

More Articles

Notable Project: Enormous CMC Steel-Sayreville EAF power cable

Notable Project: Enormous CMC Steel-Sayreville EAF power cable CMC Steel – Sayreville, NJ Massive Rotating Terminal Design Problem: The customer needed to enhance the longevity of their EAF power cable and mitigate hose binding during […]

Read More
Video Gallery

Video Shows Cable Core Construction Best Practice

Video Shows Cable Core Construction Best Practice In this 2-1/2 minute video, Founder and President Mike Pinney reveals the mysteries of what can go wrong when there’s a power cable construction failure. Frustrating as it […]

Read More

Notable Project: TimkenSteel – Harrison Mill Final Stirrer

Notable Project: TimkenSteel – Harrison Mill Final Stirrer TimkenSteel – Harrison Mill Final Stirrer Problem: Caustic flux powder used in the continuous casting process was violently attacking the carbon steel weldment of TimkenSteel’s electromagnetic final […]

Read More
Close

COVID-19 UPDATE

During this time I2r POWER remains open and in full operation ready to serve and assist our customers. We are following guidelines from public health authorities to protect the well-being of our customers, employees and community.