Video Shows Cable Core Construction Best Practice

Home / Watts Different / Video Shows Cable Core Construction Best Practice
Cable Core Mysteries Revealed

In this 2-1/2 minute video, Founder and President Mike Pinney reveals the mysteries of what can go wrong when there’s a power cable construction failure. Frustrating as it is, steel makers and maintenance professionals cannot see the problem from the outside.

In “Cable Core Construction Mysteries Revealed!,” Mike shows the basic components of an Electric Arc Furnace (EAF) cable and points out potential areas for failure. This video is the first of a new series of videos based on frequent problems customers encounter.

We hope you enjoy these tips!

Have questions about this topic?

More Articles

Notable Project: Enormous CMC Steel-Sayreville EAF power cable

Notable Project: Enormous CMC Steel-Sayreville EAF power cable CMC Steel – Sayreville, NJ Massive Rotating Terminal Design Problem: The customer needed to enhance the longevity of their EAF power cable and mitigate hose binding during […]

Read More

Notable Project: TimkenSteel – Harrison Mill Final Stirrer

Notable Project: TimkenSteel – Harrison Mill Final Stirrer TimkenSteel – Harrison Mill Final Stirrer Problem: Caustic flux powder used in the continuous casting process was violently attacking the carbon steel weldment of TimkenSteel’s electromagnetic final […]

Read More

Notable Project: CarTech’s Dual Station ESR Furnace bus tubes

Notable Project: CarTech’s Dual Station ESR Furnace bus tubes Carpenter Technologies – Latrobe, PA Problem: The retrofit and rebuild of Carpenter Technologies’ dual station ESR furnace bus tubes took some finesse. The ESR is an […]

Read More
Close

COVID-19 UPDATE

During this time I2r POWER remains open and in full operation ready to serve and assist our customers. We are following guidelines from public health authorities to protect the well-being of our customers, employees and community.